Margate & Ventnor Dune & Beach Work Update AUG 24, 2017

Video of Margate and Ventnor dune & beach work. AUG 24, 2017.

Temporary well system drilled into Margate beaches. Seems to be a French Drain, which is prone to clogging. It redirects water away from an area.

A French Drain that is not installed with a sump pump counts on gravity alone to drain pooled water.

Ventnor boardwalk views being noisily disrupted by dune building and beach widening near Wissahickon Ave. Sound of the bulldozer clackity-clack can be heard for blocks.

Leave a Comment

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.